40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 10205     Entry time: Tue Jul 15 18:39:04 2014
Author: Harry 
Type: Update 
Category: General 
Subject: Weekly Plan (7.16.14) 

 The Past Week

 

Attempted to design coupling telescope, turned out waist measurement was still off. Took another waist measurement, this time more reasonable.

Used recent waist measurement to actually design a coupling system to couple NPRO light into Panda PM980 fibers (see recent elog)

The Next Week

Assemble fiber coupling system

Measure coupling efficiency, ensure it's at least 60%

Begin measuring Polarization Extinction ratio

Materials

 

PLCX lens with f = 0.25m ------> status: here

Fiber Coupled Powermeter//PD ------> status: unknown (have any laying around?)

Quarter Wave Plate, Polarizing Beamsplitter, Photodiodes ------> status: here

other components from original razorblade measurement  setup

ELOG V3.1.3-