Mon Jul 7 16:39:09 2014, manasa, Update, PSL, PMC ringdown setup
|
Mon Jul 7 23:19:55 2014, rana, Update, PSL, PMC ringdown setup
|
Wed Jul 9 16:33:05 2014, manasa, Update, PSL, PMC ringdown setup
|
|
Message ID: 10164
Entry time: Wed Jul 9 16:33:05 2014
In reply to: 10149
|
Author: |
manasa |
Type: |
Update |
Category: |
PSL |
Subject: |
PMC ringdown setup |
|
|
Quote: |
Quote: |
I moved stuff on the PSL table to accommodate the PMC ringdown setup.
I used the beam that leaks from the steering mirror at the PMC transmission that was dumped to a razor blade dump. I installed a Y1 to steer the beam to the ringdown PD. Power in the beam 75mW.
|
I am guessing that 75 mW will burn / destroy any Thorlabs PD. I hope that mW is supposed to be uW.
|
It was ~7.5mW and measured ~2V at the PD output (given its range 0-5V ) on the oscilloscope . So PD is safe ! |