Message ID: 10158     Entry time: Tue Jul 8 23:59:49 2014
Author: Harry 
Type: Update 
Category: General 
Subject: Weekly Plan (7.8.14) 

 Last Week:

-I continued to struggle with the razorblade beam analysis, though after a sixth round of measurements, and a lot of fiddling around with fit parameters in matlab, there seems to be a light at the end of the tunnel.

 

Next Week:

-I plan to check my work with the beamscan tomorrow (wednesday) morning

-Further characterize the light from the fibers, and set up the collimator

-Design and hopefully construct the telescope that will focus the beam into the collimator

 

Materials:

- Razorblade setup or beamscan (preferably beamscan)

- Fiber Illuminator

- Collimator (soon to be ordered)

- Lenses for telescope (TBD)

 