40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Jun 19 14:41:00 2014, Manasa, Update, PSL, ISS disabled 
    Reply  Tue Jun 24 13:02:54 2014, Manasa, Update, PSL, Ringdown PD installed PSL_ringdown.png
       Reply  Mon Jun 30 22:40:21 2014, Manasa, Update, PSL, AOM ringdown AOM_ringSample1.pdf
Message ID: 10072     Entry time: Thu Jun 19 14:41:00 2014     Reply to this: 10091
Author: Manasa 
Type: Update 
Category: PSL 
Subject: ISS disabled 

I would like to measure the switching time of the AOM. So I have disconnected the modulation input to the AOM that comes from the ISS. I have also turned OFF the SR560's and the AWG that belong to ISS. 

Pics and cable connections of the state in which the ISS setup was left at, will be updated soon.

ELOG V3.1.3-