40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 100     Entry time: Wed Nov 14 12:33:35 2007
Author: tobin 
Type: AoG 
Category: Environment 
Subject: construction 
The construction crews are running a jack-hammer right outside of the control room.
Attachment 1: DSC_0172.JPG  118 kB  Uploaded Fri Nov 16 14:34:55 2007  | Hide | Hide all
DSC_0172.JPG
ELOG V3.1.3-